CONCRETE PAINT 2K resin (without hardener)
The CONCRETE PAINT 2K resin (A-component) is mixed with the CONCRETE PAINT 2K hardener (B-component). Both components together form the CONCRETE PAINT 2K epoxy resin system.
System CONCRETE PAINT 2K is used as a surface sealant. This system is suitable for various indoor and covered outdoor applications.
This system can be used as:
- Flooring Paint
- Flooring Sealant
- Garage Sealant
- Concrete Paint
- Cement Paint
- Screed Paint
- Plaster Paint
- Stone Paint
Consumption volume: 200-250g/m² per coat. Depending on the substrate, 1kg should be sufficient to paint one coat of paint on aprox. 5m². We recommend applying ca. 2 coats. We recommend applying a suitable primer (e.g. undercoat) on very porous substrates in order to minimize the absorption of CONCRETE PAINT.
Instruções de Utilização
- The temperature of the room, the substrate and the paint must be at least +15°C.
- Make sure that the substrate is clean, dry and free of any substance that may prevent the paint’s adhesion.
- Mix the resin A-component with the hardener B-component in a mixing ratio of 5:1 by weight (e.g. 5kg resin A-component to 1kg hardener B-component). Optionally, the mixture can be diluted by adding 20% water.
- To dye the mixture, add approximately 5% WB PIGMENT paste to it. (e.g. 300g colour for 6kg CONCRETE PAINT 2K)
- Stir through the edge and bottom of the mixing cup as the material will settle there. Ideally, pour into a clean mixing cup and mix again until the mixture is streak-free. This ensures that the resin A-component and hardener B-component are completely mixed together.
- To prevent the paint from thickening too quickly, pour the mixture into a paint tray immediately after mixing.
- Apply the paint to the desired surface using a foam roller. We recommend applying the paint in layers of about 0,2-0,3mm. It is recommended to apply at least 2 coats. Processing time/pot life at 20°C: aprox. 60 minutes, at 30°C: aprox. 30 minutes.
- Wait at least 12-48 hours before applying the second coat.
- Allow the coating to dry and harden for aprox. 20 hours. The Tempo de cura depends on the room temperature, the material and the substrate.
Serviço de Apoio ao Cliente:Se tiver mais perguntas, contacte-nos por telefone, e-mail ou utilize o nosso serviço de apoio WhatsApp.
Nota:Devido a diferentes condições de iluminação e monitores, as cores podem não ser apresentadas de forma uniforme.
Declarações de Ingredientes, Segurança e Perigo
Componentes A (CONCRETE PAINT 2K) Danger: Polymer epoxy resin adduct; CAS-Nr.: 260549-92-6 Causes serious eye damage. Wear protective gloves/protective clothing/eye protection/face protection. IF IN EYES: Rinse cautiously with water for several minutes. Remove contact lenses, if present and easy to do. Continue rinsing. Immediately call a POISON CENTER/doctor. Dispose of contents/container to in accordance with local/regional/international regulations. Contains epoxy compounds. May produce an allergic reaction.